Pile Foundation
Bored Cast-in-Situ Piling Specialists
Jalmala Boring Works provides Pile Foundation and Deep Foundation Solutions using Bored Cast-in-Situ Piles for residential, commercial, industrial, and infrastructure projects. With advanced Hydraulic Rotary Rigs, we construct piles from 300 mm to 1800 mm diameter and depths of up to 50 metres, delivering reliable load-bearing capacity across soft soil, hard rock, and high groundwater conditions.

Our Piling Methods
We deploy six proven techniques — selected based on soil profile, site constraints, and project requirements.

We specialize in bored piling with diameters ranging from 200 mm to 2000 mm and depths up to 50 meters. Using advanced hydraulic rotary rigs, we execute piling operations efficiently across a wide range of soil conditions. Our fleet includes high-performance rotary drilling rigs capable of working in restricted headroom areas while delivering precision, stability, and high productivity.

Secant pile walls are constructed by intersecting reinforced concrete piles to form a continuous retaining structure. Primary piles are installed first, followed by reinforced secondary piles after sufficient curing. This technique provides excellent groundwater control and soil retention, making it ideal for deep excavations, basements, and foundation support in challenging ground conditions.

The Manual Auger Method is a reliable piling technique suitable for locations with restricted access or where low noise and vibration are essential. A tripod and manual winch system are used to drill boreholes using a helical auger. This method is commonly employed for pile diameters ranging from 250 mm to 1000 mm and offers an economical solution for smaller foundation projects.

Our Truck Mounted Rotary (TMR) rigs utilize continuous bentonite slurry circulation to stabilize boreholes during drilling. Auger drilling is performed to the required depth while bentonite slurry supports the excavation and carries excavated soil back to a recycling tank. This method ensures bore stability, efficient spoil removal, and high productivity, particularly in loose or soft soil strata.

The DMC Pile Method employs Mendola-type rigs combined with bentonite drilling fluid for safe and efficient pile construction. Surface soil is loosened using a bailer before drilling continues with a percussion chisel. Bentonite slurry stabilizes the bore while transporting excavated material to settling pits. Once the desired depth is achieved, the drilling tools are removed and the final depth is verified before reinforcement and concreting.

This method utilizes tractor-mounted rotary drilling rigs for fast and economical pile boring. Auger drilling is carried out to the required depth, with DMC rods added progressively to achieve deeper penetration through varying soil strata. It is particularly suitable for medium-depth foundation works and offers drilling capacities of up to 16 meters with excellent operational efficiency.
Our Work in Action
Click any image or video to view it in full screen.










Recent Projects
Pile FoundationConstruction Process







Survey, Setting Out & Guide Casing Installation
Detailed survey, marking of pile locations, and installation of temporary guide casing.
- Detailed survey and marking of pile locations
- Verification of pile coordinates and levels
- Positioning of Hydraulic Rotary Piling Rig
- Installation of temporary guide casing
- Ensures accurate pile alignment and protects bore opening

Pile Boring & Excavation
Drilling of pile bore using Hydraulic Rotary Rig to required depth.
- Drilling of pile bore using Hydraulic Rotary Rig
- Excavation carried out to the required depth and founding strata
- Suitable drilling tools used for soil, rock, or hard strata
- Continuous monitoring of depth, verticality, and pile diameter
- Removal and disposal of excavated soil from site

Slurry Support & Borehole Cleaning
Preparation and circulation of Bentonite/Polymer Slurry and borehole cleaning.
- Preparation and circulation of Bentonite/Polymer Slurry
- Stabilization of borehole walls during drilling
- Recycling of slurry through slurry plant
- Cleaning of borehole bottom to remove loose sediments
- Final inspection of bore depth and cleanliness

Reinforcement Cage Installation
Fabrication and lowering of reinforcement cage into the bore.
- Fabrication of reinforcement cage as per approved drawings
- Installation of spacers, couplers, lifting points, and cover blocks
- Lowering of reinforcement cage into the completed bore
- Accurate positioning and level adjustment
- Quality inspection before concrete placement

Tremie Concreting
Continuous concrete placement using tremie pipes.
- Installation of tremie pipes up to borehole bottom
- Continuous placement of concrete from bottom to top
- Prevention of concrete segregation through tremie method
- Displacement and recovery of slurry during concreting
- Completion of pile concreting in one uninterrupted operation

Pile Completion & Quality Control
Final pile completion, head trimming, and quality assurance.
- Extraction of temporary casing during or after concreting
- Recording of concrete consumption and pile parameters
- Pile head chipping up to cut-off level
- Verification of pile depth, diameter, and concrete quality
- Completion of testing, documentation, and quality assurance
- Ready for pile cap and foundation construction
Bentonite Piling Contractor in India
Bentonite piling is a foundation construction approach in which bentonite-based support slurry is used during selected bored pile drilling operations to help maintain borehole stability. It is particularly relevant in loose soil, water-bearing strata and ground conditions where unsupported excavation may lead to bore collapse. Bentonite slurry creates hydrostatic pressure and helps support the surrounding soil during drilling. Jalmala Boring Works brings third-generation foundation construction experience dating back to 1962.
Bentonite is a naturally occurring clay material that develops suitable suspension properties when mixed with water. The prepared slurry is introduced into the borehole during drilling to help stabilize its walls and reduce soil movement. Its performance depends on factors such as slurry density, viscosity, sand content, filtration characteristics and the geological conditions encountered at the construction site.
Bentonite slurry piling is commonly associated with bored cast-in-situ pile construction. During the drilling process, slurry is maintained within the borehole to provide support to the excavated section. Drilling continues until the required pile depth and dimensions are achieved according to the approved structural drawings and geotechnical investigation. The construction procedure must be selected according to the actual site conditions.
One of the important functions of bentonite slurry is maintaining borehole stability in loose or groundwater-affected soil. The slurry pressure helps counterbalance surrounding ground and groundwater pressure. This reduces the risk of bore collapse during excavation when the method is appropriately designed and controlled. Suitable slurry properties and operating procedures are essential for effective bore support.
Bentonite piling requires proper preparation and monitoring of the support fluid throughout construction. Slurry properties should be checked at appropriate stages, including density, viscosity, sand content and other specified parameters. Contaminated or unsuitable slurry may require treatment or replacement before concrete placement, depending on the applicable project specifications.
After drilling reaches the specified depth, the borehole is cleaned and prepared according to the approved construction methodology. Reinforcement cages are then installed, followed by concrete placement using an appropriate tremie arrangement where required. Concrete placement and slurry displacement must be properly coordinated to maintain the quality and continuity of the completed pile.
Bentonite-supported bored piles are used in different construction applications, including high-rise buildings, commercial complexes, industrial facilities, bridges and infrastructure developments. The method can be considered where soil conditions require additional borehole support during deep foundation construction. Final selection depends on engineering design, ground investigation and project specifications.
Jalmala Boring Works is a family-owned, third-generation company specializing in pile foundations, diaphragm walls and ground anchors. With a company history dating back to 1962, the organization has experience in deep foundation construction and challenging ground conditions. Its specialization supports construction requirements across commercial, industrial and infrastructure projects.
Quality control in bentonite piling involves monitoring drilling progress, borehole dimensions, slurry properties, reinforcement installation and concrete placement. The construction team must ensure that the support fluid and drilling procedures follow approved technical requirements. Proper coordination between geotechnical and construction activities helps achieve the specified foundation performance.
When selecting a bentonite piling contractor in India, important considerations include experience in bored pile construction, understanding of soil conditions, drilling equipment capabilities and knowledge of slurry-supported foundation methods. Construction procedures should be planned according to the specific requirements of each project rather than applying a uniform approach to every site.
If your project requires bentonite piling, bored cast-in-situ piles or deep foundation construction, contact Jalmala Boring Works to discuss your requirements. Sharing the project location, proposed pile diameter, drilling depth and geotechnical information can help in understanding the appropriate construction approach.