JBW
Jalmala Boring WorksSpecializing in Pile FoundationsPartnered with India's Leading Builders & ContractorsSpecializing in Diaphragm WallSpecializing in Ground AnchorsSince 1962500+ ProjectsSpecializing in Pile FoundationsSpecializing in Diaphragm WallSpecializing in Ground AnchorsJalmala Boring WorksSince 1962Partnered with India's Leading Builders & ContractorsJalmala Boring WorksSpecializing in Pile FoundationsPartnered with India's Leading Builders & ContractorsSpecializing in Diaphragm WallSpecializing in Ground AnchorsSince 1962500+ ProjectsSpecializing in Pile FoundationsSpecializing in Diaphragm WallSpecializing in Ground AnchorsJalmala Boring WorksSince 1962Partnered with India's Leading Builders & Contractors
Gmail
Our Service

Pile Foundation

Bored Cast-in-Situ Piling Specialists

Jalmala Boring Works provides Pile Foundation and Deep Foundation Solutions using Bored Cast-in-Situ Piles for residential, commercial, industrial, and infrastructure projects. With advanced Hydraulic Rotary Rigs, we construct piles from 300 mm to 1800 mm diameter and depths of up to 50 metres, delivering reliable load-bearing capacity across soft soil, hard rock, and high groundwater conditions.

Bored Cast-in-Situ Piles: 300 mm – 1800 mm Diameter
Pile Depths up to 50 Metres
Hydraulic Rotary Rigs & DMC Percussion Methods
Temporary & Permanent Steel Casing
Tremie Concreting (RMC & Site-Mix)
Static & Dynamic Pile Load Testing
Suitable for Soft Soil, Hard Rock & High
Groundwater Conditions
Complete Deep Foundation Solutions from Design
Support to Execution
Pile Foundation — Jalmala Boring Works
50mMax Depth
How We Work

Our Piling Methods

We deploy six proven techniques — selected based on soil profile, site constraints, and project requirements.

Hydraulic Rig
01
Hydraulic Rig

We specialize in bored piling with diameters ranging from 200 mm to 2000 mm and depths up to 50 meters. Using advanced hydraulic rotary rigs, we execute piling operations efficiently across a wide range of soil conditions. Our fleet includes high-performance rotary drilling rigs capable of working in restricted headroom areas while delivering precision, stability, and high productivity.

Secant Pile Walls
02
Secant Pile Walls

Secant pile walls are constructed by intersecting reinforced concrete piles to form a continuous retaining structure. Primary piles are installed first, followed by reinforced secondary piles after sufficient curing. This technique provides excellent groundwater control and soil retention, making it ideal for deep excavations, basements, and foundation support in challenging ground conditions.

Manual Auger Method
03
Manual Auger Method

The Manual Auger Method is a reliable piling technique suitable for locations with restricted access or where low noise and vibration are essential. A tripod and manual winch system are used to drill boreholes using a helical auger. This method is commonly employed for pile diameters ranging from 250 mm to 1000 mm and offers an economical solution for smaller foundation projects.

TMR — Water Circulation
04
TMR — Water Circulation

Our Truck Mounted Rotary (TMR) rigs utilize continuous bentonite slurry circulation to stabilize boreholes during drilling. Auger drilling is performed to the required depth while bentonite slurry supports the excavation and carries excavated soil back to a recycling tank. This method ensures bore stability, efficient spoil removal, and high productivity, particularly in loose or soft soil strata.

DMC Pile Method
05
DMC Pile Method

The DMC Pile Method employs Mendola-type rigs combined with bentonite drilling fluid for safe and efficient pile construction. Surface soil is loosened using a bailer before drilling continues with a percussion chisel. Bentonite slurry stabilizes the bore while transporting excavated material to settling pits. Once the desired depth is achieved, the drilling tools are removed and the final depth is verified before reinforcement and concreting.

Tractor Mounted Rotary Rig
06
Tractor Mounted Rotary Rig

This method utilizes tractor-mounted rotary drilling rigs for fast and economical pile boring. Auger drilling is carried out to the required depth, with DMC rods added progressively to achieve deeper penetration through varying soil strata. It is particularly suitable for medium-depth foundation works and offers drilling capacities of up to 16 meters with excellent operational efficiency.

Featured Work

Recent Projects

2025–26
AFCONS INFRASTRUCTURE LTD
Twin Tunnel Underground Station
Jaipur
2024
LARSEN & TOUBRO (L&T) CONSTRUCTION
Bullet Train Section — Vadodara C-6 Package
Vadodara
2025–26
PSP PROJECTS LTD
Adani ACMD Plot A and D
Mundra, Gujarat
Jalmala Boring Works

Pile FoundationConstruction Process

Step 01 – Survey, Setting Out & Guide Casing InstallationStep 02 – Pile Boring & ExcavationStep 03 – Slurry Support & Borehole CleaningStep 04 – Reinforcement Cage InstallationStep 05 – Tremie ConcretingStep 06 – Pile Completion & Quality Control
01/06
Step 01 – Survey, Setting Out & Guide Casing Installation
01

Survey, Setting Out & Guide Casing Installation

Detailed survey, marking of pile locations, and installation of temporary guide casing.

  • Detailed survey and marking of pile locations
  • Verification of pile coordinates and levels
  • Positioning of Hydraulic Rotary Piling Rig
  • Installation of temporary guide casing
  • Ensures accurate pile alignment and protects bore opening
Phase 1
Step 02 – Pile Boring & Excavation
02

Pile Boring & Excavation

Drilling of pile bore using Hydraulic Rotary Rig to required depth.

  • Drilling of pile bore using Hydraulic Rotary Rig
  • Excavation carried out to the required depth and founding strata
  • Suitable drilling tools used for soil, rock, or hard strata
  • Continuous monitoring of depth, verticality, and pile diameter
  • Removal and disposal of excavated soil from site
Phase 2
Step 03 – Slurry Support & Borehole Cleaning
03

Slurry Support & Borehole Cleaning

Preparation and circulation of Bentonite/Polymer Slurry and borehole cleaning.

  • Preparation and circulation of Bentonite/Polymer Slurry
  • Stabilization of borehole walls during drilling
  • Recycling of slurry through slurry plant
  • Cleaning of borehole bottom to remove loose sediments
  • Final inspection of bore depth and cleanliness
Phase 3
Step 04 – Reinforcement Cage Installation
04

Reinforcement Cage Installation

Fabrication and lowering of reinforcement cage into the bore.

  • Fabrication of reinforcement cage as per approved drawings
  • Installation of spacers, couplers, lifting points, and cover blocks
  • Lowering of reinforcement cage into the completed bore
  • Accurate positioning and level adjustment
  • Quality inspection before concrete placement
Phase 4
Step 05 – Tremie Concreting
05

Tremie Concreting

Continuous concrete placement using tremie pipes.

  • Installation of tremie pipes up to borehole bottom
  • Continuous placement of concrete from bottom to top
  • Prevention of concrete segregation through tremie method
  • Displacement and recovery of slurry during concreting
  • Completion of pile concreting in one uninterrupted operation
Phase 5
Step 06 – Pile Completion & Quality Control
06

Pile Completion & Quality Control

Final pile completion, head trimming, and quality assurance.

  • Extraction of temporary casing during or after concreting
  • Recording of concrete consumption and pile parameters
  • Pile head chipping up to cut-off level
  • Verification of pile depth, diameter, and concrete quality
  • Completion of testing, documentation, and quality assurance
  • Ready for pile cap and foundation construction
Phase 6

Earth Retention Systems for Deep Excavation and Underground Construction

Earth retention systems are engineered construction solutions used to support soil and manage lateral ground pressure during excavation activities. These systems are important for basement construction, underground structures, infrastructure developments and projects involving significant differences in ground levels. Jalmala Boring Works provides specialised foundation construction services for projects requiring earth retention and excavation support solutions across India.

The selection of an appropriate earth retention system depends on excavation depth, soil characteristics, groundwater conditions, nearby structures and project specifications. Diaphragm walls are commonly used for deep basements and underground construction because they provide a reinforced retaining structure. Depending on the design, these walls can serve as temporary excavation support or form part of the permanent underground structure.

Pile-based retaining systems are another option for suitable excavation conditions. Contiguous and secant pile walls can be considered according to ground conditions, groundwater requirements and structural design. These systems use bored piles arranged along the excavation boundary to provide lateral soil support. The appropriate pile arrangement is determined through geotechnical and structural engineering assessments.

Ground anchors can provide additional support to retaining walls by transferring tensile forces into suitable ground beyond the excavation zone. Anchors may be installed at different levels as excavation progresses, subject to approved engineering designs and site constraints. Depending on project requirements, additional support arrangements such as struts may also be incorporated into the earth retention system.

Earth retention systems are widely used for high-rise building basements, commercial developments, industrial facilities, underground parking, metro stations, tunnels and major infrastructure projects. Proper planning considers ground movement, neighbouring foundations, excavation sequencing, water conditions and construction safety. Monitoring and quality control are essential throughout the execution process.

Jalmala Boring Works is a family-owned, third-generation foundation engineering company with a history dating back to 1962. The company specialises in pile foundations, diaphragm walls and ground anchor construction. Its foundation engineering experience supports construction projects involving deep excavation, underground structures and challenging ground conditions.

Every earth retention project requires a suitable construction methodology based on geotechnical investigations, structural drawings and site-specific conditions. Jalmala Boring Works focuses on project planning, suitable equipment selection and construction practices to undertake earth retention and foundation works for projects across India.