Pile Foundation
Bored Cast-in-Situ Piling Specialists
Jalmala Boring Works provides Pile Foundation and Deep Foundation Solutions using Bored Cast-in-Situ Piles for residential, commercial, industrial, and infrastructure projects. With advanced Hydraulic Rotary Rigs, we construct piles from 300 mm to 1800 mm diameter and depths of up to 50 metres, delivering reliable load-bearing capacity across soft soil, hard rock, and high groundwater conditions.

Our Piling Methods
We deploy six proven techniques — selected based on soil profile, site constraints, and project requirements.

We specialize in bored piling with diameters ranging from 200 mm to 2000 mm and depths up to 50 meters. Using advanced hydraulic rotary rigs, we execute piling operations efficiently across a wide range of soil conditions. Our fleet includes high-performance rotary drilling rigs capable of working in restricted headroom areas while delivering precision, stability, and high productivity.

Secant pile walls are constructed by intersecting reinforced concrete piles to form a continuous retaining structure. Primary piles are installed first, followed by reinforced secondary piles after sufficient curing. This technique provides excellent groundwater control and soil retention, making it ideal for deep excavations, basements, and foundation support in challenging ground conditions.

The Manual Auger Method is a reliable piling technique suitable for locations with restricted access or where low noise and vibration are essential. A tripod and manual winch system are used to drill boreholes using a helical auger. This method is commonly employed for pile diameters ranging from 250 mm to 1000 mm and offers an economical solution for smaller foundation projects.

Our Truck Mounted Rotary (TMR) rigs utilize continuous bentonite slurry circulation to stabilize boreholes during drilling. Auger drilling is performed to the required depth while bentonite slurry supports the excavation and carries excavated soil back to a recycling tank. This method ensures bore stability, efficient spoil removal, and high productivity, particularly in loose or soft soil strata.

The DMC Pile Method employs Mendola-type rigs combined with bentonite drilling fluid for safe and efficient pile construction. Surface soil is loosened using a bailer before drilling continues with a percussion chisel. Bentonite slurry stabilizes the bore while transporting excavated material to settling pits. Once the desired depth is achieved, the drilling tools are removed and the final depth is verified before reinforcement and concreting.

This method utilizes tractor-mounted rotary drilling rigs for fast and economical pile boring. Auger drilling is carried out to the required depth, with DMC rods added progressively to achieve deeper penetration through varying soil strata. It is particularly suitable for medium-depth foundation works and offers drilling capacities of up to 16 meters with excellent operational efficiency.
Our Work in Action
Click any image or video to view it in full screen.










Recent Projects
Pile FoundationConstruction Process







Survey, Setting Out & Guide Casing Installation
Detailed survey, marking of pile locations, and installation of temporary guide casing.
- Detailed survey and marking of pile locations
- Verification of pile coordinates and levels
- Positioning of Hydraulic Rotary Piling Rig
- Installation of temporary guide casing
- Ensures accurate pile alignment and protects bore opening

Pile Boring & Excavation
Drilling of pile bore using Hydraulic Rotary Rig to required depth.
- Drilling of pile bore using Hydraulic Rotary Rig
- Excavation carried out to the required depth and founding strata
- Suitable drilling tools used for soil, rock, or hard strata
- Continuous monitoring of depth, verticality, and pile diameter
- Removal and disposal of excavated soil from site

Slurry Support & Borehole Cleaning
Preparation and circulation of Bentonite/Polymer Slurry and borehole cleaning.
- Preparation and circulation of Bentonite/Polymer Slurry
- Stabilization of borehole walls during drilling
- Recycling of slurry through slurry plant
- Cleaning of borehole bottom to remove loose sediments
- Final inspection of bore depth and cleanliness

Reinforcement Cage Installation
Fabrication and lowering of reinforcement cage into the bore.
- Fabrication of reinforcement cage as per approved drawings
- Installation of spacers, couplers, lifting points, and cover blocks
- Lowering of reinforcement cage into the completed bore
- Accurate positioning and level adjustment
- Quality inspection before concrete placement

Tremie Concreting
Continuous concrete placement using tremie pipes.
- Installation of tremie pipes up to borehole bottom
- Continuous placement of concrete from bottom to top
- Prevention of concrete segregation through tremie method
- Displacement and recovery of slurry during concreting
- Completion of pile concreting in one uninterrupted operation

Pile Completion & Quality Control
Final pile completion, head trimming, and quality assurance.
- Extraction of temporary casing during or after concreting
- Recording of concrete consumption and pile parameters
- Pile head chipping up to cut-off level
- Verification of pile depth, diameter, and concrete quality
- Completion of testing, documentation, and quality assurance
- Ready for pile cap and foundation construction
Pile Boring Contractor in India
Pile boring is a fundamental process in deep foundation construction used to create boreholes for bored cast-in-situ pile foundations. It involves drilling into the ground to the required diameter and depth according to approved structural drawings and geotechnical investigation. These piles transfer building and infrastructure loads to suitable soil or rock strata. Jalmala Boring Works is a family-owned, third-generation foundation construction company with a history dating back to 1962.
Pile boring is commonly selected for projects where conventional shallow foundations may not provide the required load capacity or settlement performance. The appropriate pile type, diameter, depth and construction method depend on ground conditions, groundwater levels, structural loading and project specifications. Proper geotechnical assessment helps determine the foundation approach.
The pile boring process generally begins with setting out the pile location according to approved construction drawings. The drilling equipment is positioned and aligned before excavation begins. The borehole is then advanced using suitable drilling tools and equipment based on soil conditions, required pile dimensions and site accessibility.
Different pile boring techniques are used depending on the geological conditions and project requirements. Rotary drilling is commonly used for bored pile construction, while temporary casing or suitable borehole support fluids may be required where unstable soil or groundwater conditions are encountered. The construction method must maintain borehole stability throughout drilling.
In temporary casing methods, steel casing sections are installed to support the borehole through unstable ground layers. The casing helps reduce the risk of soil collapse and provides support during drilling. Depending on the design and construction procedure, casing may be withdrawn during or after concrete placement. The installation and removal sequence must follow the approved method statement.
In soil conditions requiring fluid support, bentonite or polymer slurry may be used to help maintain borehole stability. These support fluids create a stabilizing environment within the excavation. Their properties and condition must be managed according to project requirements and the applicable construction procedure. Borehole cleaning is also important before reinforcement and concrete placement.
After reaching the specified depth, the borehole is checked according to the project inspection procedure. The reinforcement cage is then lowered into position as specified in the structural drawings. Concrete is placed using an approved method, which may include tremie concreting when groundwater or support slurry is present in the borehole.
Pile boring requires careful control of drilling depth, borehole diameter, verticality and ground conditions. These parameters influence the completed pile geometry and construction quality. Site monitoring and inspection should be carried out in accordance with approved drawings, technical specifications and the project quality plan.
Bored pile foundations are widely used in high-rise buildings, bridges, flyovers, industrial plants, commercial complexes, metro infrastructure and other major construction projects. They are particularly useful where deep foundation elements are required to transfer significant structural loads through challenging soil conditions.
Jalmala Boring Works specializes in pile foundations, diaphragm walls and ground anchors. As a family-owned, third-generation company with a history dating back to 1962, it brings long-standing experience in deep foundation construction. The company's specialization supports foundation requirements for commercial, industrial and infrastructure developments.
Selecting a suitable pile boring contractor requires consideration of technical experience, drilling equipment, site conditions and construction planning. Proper coordination between pile setting out, drilling, borehole cleaning, reinforcement installation and concrete placement is important for completing foundation work according to project specifications.
If your project requires pile boring, bored cast-in-situ piles or deep foundation construction, contact Jalmala Boring Works to discuss your requirements. Sharing the project location, proposed pile diameter, drilling depth and geotechnical information can help identify a suitable construction approach.