Pile Foundation
Bored Cast-in-Situ Piling Specialists
Jalmala Boring Works provides Pile Foundation and Deep Foundation Solutions using Bored Cast-in-Situ Piles for residential, commercial, industrial, and infrastructure projects. With advanced Hydraulic Rotary Rigs, we construct piles from 300 mm to 1800 mm diameter and depths of up to 50 metres, delivering reliable load-bearing capacity across soft soil, hard rock, and high groundwater conditions.

Our Piling Methods
We deploy six proven techniques — selected based on soil profile, site constraints, and project requirements.

We specialize in bored piling with diameters ranging from 200 mm to 2000 mm and depths up to 50 meters. Using advanced hydraulic rotary rigs, we execute piling operations efficiently across a wide range of soil conditions. Our fleet includes high-performance rotary drilling rigs capable of working in restricted headroom areas while delivering precision, stability, and high productivity.

Secant pile walls are constructed by intersecting reinforced concrete piles to form a continuous retaining structure. Primary piles are installed first, followed by reinforced secondary piles after sufficient curing. This technique provides excellent groundwater control and soil retention, making it ideal for deep excavations, basements, and foundation support in challenging ground conditions.

The Manual Auger Method is a reliable piling technique suitable for locations with restricted access or where low noise and vibration are essential. A tripod and manual winch system are used to drill boreholes using a helical auger. This method is commonly employed for pile diameters ranging from 250 mm to 1000 mm and offers an economical solution for smaller foundation projects.

Our Truck Mounted Rotary (TMR) rigs utilize continuous bentonite slurry circulation to stabilize boreholes during drilling. Auger drilling is performed to the required depth while bentonite slurry supports the excavation and carries excavated soil back to a recycling tank. This method ensures bore stability, efficient spoil removal, and high productivity, particularly in loose or soft soil strata.

The DMC Pile Method employs Mendola-type rigs combined with bentonite drilling fluid for safe and efficient pile construction. Surface soil is loosened using a bailer before drilling continues with a percussion chisel. Bentonite slurry stabilizes the bore while transporting excavated material to settling pits. Once the desired depth is achieved, the drilling tools are removed and the final depth is verified before reinforcement and concreting.

This method utilizes tractor-mounted rotary drilling rigs for fast and economical pile boring. Auger drilling is carried out to the required depth, with DMC rods added progressively to achieve deeper penetration through varying soil strata. It is particularly suitable for medium-depth foundation works and offers drilling capacities of up to 16 meters with excellent operational efficiency.
Our Work in Action
Click any image or video to view it in full screen.










Recent Projects
Pile FoundationConstruction Process







Survey, Setting Out & Guide Casing Installation
Detailed survey, marking of pile locations, and installation of temporary guide casing.
- Detailed survey and marking of pile locations
- Verification of pile coordinates and levels
- Positioning of Hydraulic Rotary Piling Rig
- Installation of temporary guide casing
- Ensures accurate pile alignment and protects bore opening

Pile Boring & Excavation
Drilling of pile bore using Hydraulic Rotary Rig to required depth.
- Drilling of pile bore using Hydraulic Rotary Rig
- Excavation carried out to the required depth and founding strata
- Suitable drilling tools used for soil, rock, or hard strata
- Continuous monitoring of depth, verticality, and pile diameter
- Removal and disposal of excavated soil from site

Slurry Support & Borehole Cleaning
Preparation and circulation of Bentonite/Polymer Slurry and borehole cleaning.
- Preparation and circulation of Bentonite/Polymer Slurry
- Stabilization of borehole walls during drilling
- Recycling of slurry through slurry plant
- Cleaning of borehole bottom to remove loose sediments
- Final inspection of bore depth and cleanliness

Reinforcement Cage Installation
Fabrication and lowering of reinforcement cage into the bore.
- Fabrication of reinforcement cage as per approved drawings
- Installation of spacers, couplers, lifting points, and cover blocks
- Lowering of reinforcement cage into the completed bore
- Accurate positioning and level adjustment
- Quality inspection before concrete placement

Tremie Concreting
Continuous concrete placement using tremie pipes.
- Installation of tremie pipes up to borehole bottom
- Continuous placement of concrete from bottom to top
- Prevention of concrete segregation through tremie method
- Displacement and recovery of slurry during concreting
- Completion of pile concreting in one uninterrupted operation

Pile Completion & Quality Control
Final pile completion, head trimming, and quality assurance.
- Extraction of temporary casing during or after concreting
- Recording of concrete consumption and pile parameters
- Pile head chipping up to cut-off level
- Verification of pile depth, diameter, and concrete quality
- Completion of testing, documentation, and quality assurance
- Ready for pile cap and foundation construction
Pile Load Testing Contractor in India
Pile load testing is an important part of foundation engineering used to evaluate the load-bearing behaviour and performance of pile foundations. It helps engineers assess how installed piles respond to applied loads and whether their performance meets the requirements specified in the foundation design. Pile load testing is particularly relevant to high-rise buildings, commercial developments, industrial facilities, bridges and infrastructure projects where deep foundation systems are required. Jalmala Boring Works brings third-generation foundation construction experience dating back to 1962.
Pile foundations transfer structural loads through soil and rock layers to provide stability for buildings and infrastructure. Since actual ground conditions can vary across a construction site, load testing provides valuable information about the response of a pile under specified loading conditions. Testing requirements are determined by the structural design, geotechnical investigation, applicable standards and project specifications.
Static pile load testing is one of the established methods used to evaluate pile performance. During a static load test, a predetermined load is applied to the pile using a suitable loading arrangement. Measurements of pile movement or settlement are recorded at specified load increments and durations. The resulting observations help engineers understand the relationship between applied load and pile displacement.
Different types of pile load tests may be conducted according to the intended purpose of the investigation. Vertical compression load testing evaluates the response of a pile under downward loading. Tension or uplift load testing examines resistance against upward forces, while lateral load testing evaluates pile behaviour under horizontal forces. The appropriate testing method depends on the structural loading conditions and foundation design.
Pile load testing generally requires suitable loading equipment, reaction arrangements, calibrated measuring instruments and carefully prepared test procedures. Depending on the testing method, reaction systems may involve kentledge, anchor piles or other engineered arrangements. Test locations, loading sequences, measurement intervals and acceptance criteria should follow approved project specifications and relevant engineering standards.
The information obtained from pile load testing can assist engineers in assessing settlement characteristics, load response and foundation performance. Test results are interpreted alongside geotechnical investigation reports, pile installation records and structural design requirements. This helps the engineering team evaluate whether the installed foundation system satisfies the specified performance criteria.
Jalmala Boring Works is a family-owned, third-generation company specializing in pile foundations, diaphragm walls and ground anchors. With a history dating back to 1962, the company has experience in deep foundation construction and challenging ground conditions. Its foundation construction expertise supports commercial, industrial and infrastructure developments requiring reliable underground structural systems.
Pile load testing is also an important consideration during projects involving bored cast-in-situ piles, rotary bored piles and other deep foundation systems. The testing programme should be coordinated with pile construction activities to ensure that the selected test piles, loading arrangements and evaluation procedures satisfy the project requirements.
When selecting a pile foundation contractor in India, project owners and engineering consultants should consider technical experience, construction capabilities, understanding of geotechnical conditions and coordination with testing specialists. Load testing should be performed by appropriately qualified testing personnel using suitable equipment and approved procedures.
If your construction project requires pile foundation construction or technical coordination for pile load testing, contact Jalmala Boring Works to discuss your requirements. Sharing project specifications, pile dimensions, proposed loading conditions and geotechnical information can help establish the appropriate foundation construction approach.