Pile Foundation
Bored Cast-in-Situ Piling Specialists
Jalmala Boring Works provides Pile Foundation and Deep Foundation Solutions using Bored Cast-in-Situ Piles for residential, commercial, industrial, and infrastructure projects. With advanced Hydraulic Rotary Rigs, we construct piles from 300 mm to 1800 mm diameter and depths of up to 50 metres, delivering reliable load-bearing capacity across soft soil, hard rock, and high groundwater conditions.

Our Piling Methods
We deploy six proven techniques — selected based on soil profile, site constraints, and project requirements.

We specialize in bored piling with diameters ranging from 200 mm to 2000 mm and depths up to 50 meters. Using advanced hydraulic rotary rigs, we execute piling operations efficiently across a wide range of soil conditions. Our fleet includes high-performance rotary drilling rigs capable of working in restricted headroom areas while delivering precision, stability, and high productivity.

Secant pile walls are constructed by intersecting reinforced concrete piles to form a continuous retaining structure. Primary piles are installed first, followed by reinforced secondary piles after sufficient curing. This technique provides excellent groundwater control and soil retention, making it ideal for deep excavations, basements, and foundation support in challenging ground conditions.

The Manual Auger Method is a reliable piling technique suitable for locations with restricted access or where low noise and vibration are essential. A tripod and manual winch system are used to drill boreholes using a helical auger. This method is commonly employed for pile diameters ranging from 250 mm to 1000 mm and offers an economical solution for smaller foundation projects.

Our Truck Mounted Rotary (TMR) rigs utilize continuous bentonite slurry circulation to stabilize boreholes during drilling. Auger drilling is performed to the required depth while bentonite slurry supports the excavation and carries excavated soil back to a recycling tank. This method ensures bore stability, efficient spoil removal, and high productivity, particularly in loose or soft soil strata.

The DMC Pile Method employs Mendola-type rigs combined with bentonite drilling fluid for safe and efficient pile construction. Surface soil is loosened using a bailer before drilling continues with a percussion chisel. Bentonite slurry stabilizes the bore while transporting excavated material to settling pits. Once the desired depth is achieved, the drilling tools are removed and the final depth is verified before reinforcement and concreting.

This method utilizes tractor-mounted rotary drilling rigs for fast and economical pile boring. Auger drilling is carried out to the required depth, with DMC rods added progressively to achieve deeper penetration through varying soil strata. It is particularly suitable for medium-depth foundation works and offers drilling capacities of up to 16 meters with excellent operational efficiency.
Our Work in Action
Click any image or video to view it in full screen.










Recent Projects
Pile FoundationConstruction Process







Survey, Setting Out & Guide Casing Installation
Detailed survey, marking of pile locations, and installation of temporary guide casing.
- Detailed survey and marking of pile locations
- Verification of pile coordinates and levels
- Positioning of Hydraulic Rotary Piling Rig
- Installation of temporary guide casing
- Ensures accurate pile alignment and protects bore opening

Pile Boring & Excavation
Drilling of pile bore using Hydraulic Rotary Rig to required depth.
- Drilling of pile bore using Hydraulic Rotary Rig
- Excavation carried out to the required depth and founding strata
- Suitable drilling tools used for soil, rock, or hard strata
- Continuous monitoring of depth, verticality, and pile diameter
- Removal and disposal of excavated soil from site

Slurry Support & Borehole Cleaning
Preparation and circulation of Bentonite/Polymer Slurry and borehole cleaning.
- Preparation and circulation of Bentonite/Polymer Slurry
- Stabilization of borehole walls during drilling
- Recycling of slurry through slurry plant
- Cleaning of borehole bottom to remove loose sediments
- Final inspection of bore depth and cleanliness

Reinforcement Cage Installation
Fabrication and lowering of reinforcement cage into the bore.
- Fabrication of reinforcement cage as per approved drawings
- Installation of spacers, couplers, lifting points, and cover blocks
- Lowering of reinforcement cage into the completed bore
- Accurate positioning and level adjustment
- Quality inspection before concrete placement

Tremie Concreting
Continuous concrete placement using tremie pipes.
- Installation of tremie pipes up to borehole bottom
- Continuous placement of concrete from bottom to top
- Prevention of concrete segregation through tremie method
- Displacement and recovery of slurry during concreting
- Completion of pile concreting in one uninterrupted operation

Pile Completion & Quality Control
Final pile completion, head trimming, and quality assurance.
- Extraction of temporary casing during or after concreting
- Recording of concrete consumption and pile parameters
- Pile head chipping up to cut-off level
- Verification of pile depth, diameter, and concrete quality
- Completion of testing, documentation, and quality assurance
- Ready for pile cap and foundation construction
Polymer Piling Contractor in India
Polymer piling is a deep foundation construction method in which specially formulated polymer support fluid is used during selected bored pile drilling operations to help maintain borehole stability. This technique can be suitable for certain soil conditions where unsupported excavation may result in bore collapse or ground instability. Polymer-supported drilling is used in foundation projects requiring controlled borehole excavation and reliable pile installation procedures. Jalmala Boring Works brings third-generation foundation construction experience dating back to 1962.
Polymer support fluids are formulated using suitable synthetic or natural polymer products mixed with water. Depending on the product formulation and ground conditions, the fluid helps stabilize the borehole by developing suitable rheological and filtration characteristics. Unlike conventional bentonite slurry, polymer fluids have different physical and chemical properties, making product selection and preparation important for successful drilling operations.
During polymer-supported bored pile construction, the drilling process is carried out while maintaining appropriate support fluid within the borehole. The fluid helps reduce soil movement and supports borehole walls during excavation. Drilling continues until the specified pile diameter and depth are achieved according to the approved structural drawings and geotechnical investigation.
Polymer piling can be considered for bored cast-in-situ pile construction, rotary bored piling and other deep foundation applications. The selection of polymer support fluid depends on soil composition, groundwater conditions, drilling depth, pile dimensions and project requirements. A suitable construction methodology must be selected after evaluating actual site conditions.
One important consideration in polymer-supported drilling is maintaining suitable fluid properties throughout excavation. Parameters such as viscosity, density, sand content and other product-specific characteristics should be monitored according to the approved technical specifications. Proper fluid preparation and circulation help maintain consistent drilling conditions.
After reaching the required drilling depth, the borehole is cleaned and prepared for reinforcement installation and concreting. Depending on the polymer system and project specifications, suitable cleaning procedures may be required to remove suspended soil particles and ensure acceptable bore conditions. Reinforcement cages are installed before concrete placement using an appropriate approved construction method.
Concrete placement in polymer-supported bored piles requires coordination between drilling, bore cleaning, reinforcement installation and concreting operations. Where required, concrete is placed using a tremie pipe to displace the support fluid and maintain continuous concrete placement. The complete procedure should comply with applicable engineering standards and project specifications.
Polymer-supported piling may be considered for residential buildings, commercial developments, industrial facilities, bridges and infrastructure projects involving deep foundation requirements. The method can be useful in selected challenging ground conditions, depending on the polymer formulation, geotechnical characteristics and construction equipment.
Jalmala Boring Works is a family-owned, third-generation company specializing in pile foundations, diaphragm walls and ground anchors. With a company history dating back to 1962, the organization has experience in deep foundation construction, difficult soil conditions and complex infrastructure requirements. Its foundation construction specialization supports commercial, industrial and infrastructure developments.
Quality control during polymer piling involves monitoring borehole depth, diameter, verticality, support fluid characteristics, reinforcement placement and concrete installation. The selected polymer system must be suitable for the ground conditions and compatible with the approved construction procedure. Proper coordination between engineering and site operations is important for achieving the specified foundation requirements.
When selecting a polymer piling contractor in India, important considerations include experience in bored pile construction, drilling equipment capabilities, understanding of ground conditions and knowledge of support fluid management. Every project requires an execution strategy based on its specific geotechnical and structural requirements.
If your upcoming project requires polymer-supported piling, bored cast-in-situ piles or deep foundation construction, contact Jalmala Boring Works to discuss your requirements. Providing project location, proposed pile diameter, drilling depth and geotechnical information can help establish a suitable construction approach.