Jalmala Boring WorksSpecializing in Pile FoundationsPartnered with India's Leading Builders & ContractorsSpecializing in Diaphragm WallSpecializing in Ground AnchorsSince 1962500+ ProjectsSpecializing in Pile FoundationsSpecializing in Diaphragm WallSpecializing in Ground AnchorsJalmala Boring WorksSince 1962Partnered with India's Leading Builders & ContractorsJalmala Boring WorksSpecializing in Pile FoundationsPartnered with India's Leading Builders & ContractorsSpecializing in Diaphragm WallSpecializing in Ground AnchorsSince 1962500+ ProjectsSpecializing in Pile FoundationsSpecializing in Diaphragm WallSpecializing in Ground AnchorsJalmala Boring WorksSince 1962Partnered with India's Leading Builders & Contractors
Gmail
Our Service

Pile Foundation

Bored Cast-in-Situ Piling Specialists

Jalmala Boring Works provides Pile Foundation and Deep Foundation Solutions using Bored Cast-in-Situ Piles for residential, commercial, industrial, and infrastructure projects. With advanced Hydraulic Rotary Rigs, we construct piles from 300 mm to 1800 mm diameter and depths of up to 50 metres, delivering reliable load-bearing capacity across soft soil, hard rock, and high groundwater conditions.

Bored Cast-in-Situ Piles: 300 mm – 1800 mm Diameter
Pile Depths up to 50 Metres
Hydraulic Rotary Rigs & DMC Percussion Methods
Temporary & Permanent Steel Casing
Tremie Concreting (RMC & Site-Mix)
Static & Dynamic Pile Load Testing
Suitable for Soft Soil, Hard Rock & High
Groundwater Conditions
Complete Deep Foundation Solutions from Design
Support to Execution
Pile Foundation — Jalmala Boring Works
50mMax Depth
How We Work

Our Piling Methods

We deploy six proven techniques — selected based on soil profile, site constraints, and project requirements.

Hydraulic Rig
01
Hydraulic Rig

We specialize in bored piling with diameters ranging from 200 mm to 2000 mm and depths up to 50 meters. Using advanced hydraulic rotary rigs, we execute piling operations efficiently across a wide range of soil conditions. Our fleet includes high-performance rotary drilling rigs capable of working in restricted headroom areas while delivering precision, stability, and high productivity.

Secant Pile Walls
02
Secant Pile Walls

Secant pile walls are constructed by intersecting reinforced concrete piles to form a continuous retaining structure. Primary piles are installed first, followed by reinforced secondary piles after sufficient curing. This technique provides excellent groundwater control and soil retention, making it ideal for deep excavations, basements, and foundation support in challenging ground conditions.

Manual Auger Method
03
Manual Auger Method

The Manual Auger Method is a reliable piling technique suitable for locations with restricted access or where low noise and vibration are essential. A tripod and manual winch system are used to drill boreholes using a helical auger. This method is commonly employed for pile diameters ranging from 250 mm to 1000 mm and offers an economical solution for smaller foundation projects.

TMR — Water Circulation
04
TMR — Water Circulation

Our Truck Mounted Rotary (TMR) rigs utilize continuous bentonite slurry circulation to stabilize boreholes during drilling. Auger drilling is performed to the required depth while bentonite slurry supports the excavation and carries excavated soil back to a recycling tank. This method ensures bore stability, efficient spoil removal, and high productivity, particularly in loose or soft soil strata.

DMC Pile Method
05
DMC Pile Method

The DMC Pile Method employs Mendola-type rigs combined with bentonite drilling fluid for safe and efficient pile construction. Surface soil is loosened using a bailer before drilling continues with a percussion chisel. Bentonite slurry stabilizes the bore while transporting excavated material to settling pits. Once the desired depth is achieved, the drilling tools are removed and the final depth is verified before reinforcement and concreting.

Tractor Mounted Rotary Rig
06
Tractor Mounted Rotary Rig

This method utilizes tractor-mounted rotary drilling rigs for fast and economical pile boring. Auger drilling is carried out to the required depth, with DMC rods added progressively to achieve deeper penetration through varying soil strata. It is particularly suitable for medium-depth foundation works and offers drilling capacities of up to 16 meters with excellent operational efficiency.

Featured Work

Recent Projects

2025–26
AFCONS INFRASTRUCTURE LTD
Twin Tunnel Underground Station
Jaipur
2024
LARSEN & TOUBRO (L&T) CONSTRUCTION
Bullet Train Section — Vadodara C-6 Package
Vadodara
2025–26
PSP PROJECTS LTD
Adani ACMD Plot A and D
Mundra, Gujarat
Jalmala Boring Works

Pile FoundationConstruction Process

Step 01 – Survey, Setting Out & Guide Casing InstallationStep 02 – Pile Boring & ExcavationStep 03 – Slurry Support & Borehole CleaningStep 04 – Reinforcement Cage InstallationStep 05 – Tremie ConcretingStep 06 – Pile Completion & Quality Control
01/06
Step 01 – Survey, Setting Out & Guide Casing Installation
01

Survey, Setting Out & Guide Casing Installation

Detailed survey, marking of pile locations, and installation of temporary guide casing.

  • Detailed survey and marking of pile locations
  • Verification of pile coordinates and levels
  • Positioning of Hydraulic Rotary Piling Rig
  • Installation of temporary guide casing
  • Ensures accurate pile alignment and protects bore opening
Phase 1
Step 02 – Pile Boring & Excavation
02

Pile Boring & Excavation

Drilling of pile bore using Hydraulic Rotary Rig to required depth.

  • Drilling of pile bore using Hydraulic Rotary Rig
  • Excavation carried out to the required depth and founding strata
  • Suitable drilling tools used for soil, rock, or hard strata
  • Continuous monitoring of depth, verticality, and pile diameter
  • Removal and disposal of excavated soil from site
Phase 2
Step 03 – Slurry Support & Borehole Cleaning
03

Slurry Support & Borehole Cleaning

Preparation and circulation of Bentonite/Polymer Slurry and borehole cleaning.

  • Preparation and circulation of Bentonite/Polymer Slurry
  • Stabilization of borehole walls during drilling
  • Recycling of slurry through slurry plant
  • Cleaning of borehole bottom to remove loose sediments
  • Final inspection of bore depth and cleanliness
Phase 3
Step 04 – Reinforcement Cage Installation
04

Reinforcement Cage Installation

Fabrication and lowering of reinforcement cage into the bore.

  • Fabrication of reinforcement cage as per approved drawings
  • Installation of spacers, couplers, lifting points, and cover blocks
  • Lowering of reinforcement cage into the completed bore
  • Accurate positioning and level adjustment
  • Quality inspection before concrete placement
Phase 4
Step 05 – Tremie Concreting
05

Tremie Concreting

Continuous concrete placement using tremie pipes.

  • Installation of tremie pipes up to borehole bottom
  • Continuous placement of concrete from bottom to top
  • Prevention of concrete segregation through tremie method
  • Displacement and recovery of slurry during concreting
  • Completion of pile concreting in one uninterrupted operation
Phase 5
Step 06 – Pile Completion & Quality Control
06

Pile Completion & Quality Control

Final pile completion, head trimming, and quality assurance.

  • Extraction of temporary casing during or after concreting
  • Recording of concrete consumption and pile parameters
  • Pile head chipping up to cut-off level
  • Verification of pile depth, diameter, and concrete quality
  • Completion of testing, documentation, and quality assurance
  • Ready for pile cap and foundation construction
Phase 6

Reinforcement Cage for Pile Foundation

A reinforcement cage is an important structural component of a bored cast-in-situ pile foundation. It is an assembly of steel reinforcement bars arranged and connected according to the approved structural drawings. The cage is lowered into the drilled pile borehole before concrete placement. It provides the required reinforcement within the concrete pile and helps the foundation resist the structural forces specified in the engineering design. Jalmala Boring Works is a third-generation foundation construction company with a history dating back to 1962.

In deep foundation construction, reinforcement cages are designed according to pile diameter, pile depth, loading conditions, reinforcement details and geotechnical requirements. The number and diameter of longitudinal bars, spacing of transverse reinforcement, spiral reinforcement and connection details are determined by the structural design. Proper coordination between engineering drawings and site execution is essential for achieving the specified reinforcement arrangement.

Reinforcement cage fabrication involves cutting, bending and assembling steel bars according to approved reinforcement schedules. Longitudinal bars are arranged around the cage, while circular links or spiral reinforcement are provided as specified in the design. The components are connected using suitable tying or approved welding procedures wherever permitted by the project specifications.

The overall dimensions of the reinforcement cage must correspond to the specified pile diameter and reinforcement detailing. Adequate concrete cover is important to protect the reinforcement and support the durability of the pile. Suitable spacers or centralizers are used as specified to maintain the required cover between the steel cage and the surrounding borehole.

Before installation, the reinforcement cage should be checked for dimensions, bar arrangement, connection quality, stability and conformity with approved drawings. Any lifting arrangements should be planned according to the cage length, weight and handling requirements. Proper lifting methods help reduce the risk of deformation during transportation and installation.

Reinforcement cage installation is carried out after the pile borehole has been drilled and prepared according to the approved construction procedure. The cage is carefully lowered into the borehole using suitable lifting equipment. During lowering, care is required to avoid damaging the cage, disturbing the borehole or causing the reinforcement to come into contact with the borehole sides.

For deep bored piles, reinforcement cages may be manufactured in multiple sections depending on their overall length, transportation limitations and site conditions. Where sectional installation is required, cage segments are connected using the approved mechanical, lap-splicing or other specified connection arrangement. The joints must comply with the structural drawings and applicable project requirements.

Correct positioning of the reinforcement cage is essential during pile construction. The cage should be installed at the specified depth and maintained in the required alignment. Suitable supports and positioning arrangements help prevent unwanted movement or displacement during concrete placement. The installation sequence should be coordinated with the tremie pipe arrangement wherever tremie concreting is required.

Reinforcement cages are commonly used in bored cast-in-situ pile foundations for high-rise buildings, bridges, industrial plants, commercial developments and infrastructure projects. They are particularly important in deep foundations where piles transfer structural loads through soil layers to suitable supporting strata. The reinforcement details depend on the specific structural and ground conditions of each project.

Quality control during reinforcement cage work includes checking steel specifications, bar diameters, spacing, cage dimensions, connection details, concrete cover arrangements and final installation depth. Inspection and documentation should follow the approved project quality plan. Any changes to the reinforcement arrangement must be reviewed and approved by the responsible design authority.

Jalmala Boring Works is a family-owned, third-generation company specializing in pile foundations, diaphragm walls and ground anchors. With a company history dating back to 1962, the organization has experience in deep foundation construction and challenging site conditions. Its specialization supports foundation requirements for commercial, industrial and infrastructure projects.

Selecting an experienced pile foundation contractor is important for coordinating drilling, reinforcement installation and concrete placement. Proper planning helps ensure that the reinforcement cage is fabricated, handled and installed according to the approved design. Project requirements, including pile diameter, cage length, reinforcement details and site access, should be considered before construction begins.

If your project requires bored cast-in-situ pile foundations or deep foundation construction, contact Jalmala Boring Works to discuss your requirements. Share your project location, pile dimensions and foundation drawings to help determine the appropriate construction approach.