Pile Foundation
Bored Cast-in-Situ Piling Specialists
Jalmala Boring Works provides Pile Foundation and Deep Foundation Solutions using Bored Cast-in-Situ Piles for residential, commercial, industrial, and infrastructure projects. With advanced Hydraulic Rotary Rigs, we construct piles from 300 mm to 1800 mm diameter and depths of up to 50 metres, delivering reliable load-bearing capacity across soft soil, hard rock, and high groundwater conditions.

Our Piling Methods
We deploy six proven techniques — selected based on soil profile, site constraints, and project requirements.

We specialize in bored piling with diameters ranging from 200 mm to 2000 mm and depths up to 50 meters. Using advanced hydraulic rotary rigs, we execute piling operations efficiently across a wide range of soil conditions. Our fleet includes high-performance rotary drilling rigs capable of working in restricted headroom areas while delivering precision, stability, and high productivity.

Secant pile walls are constructed by intersecting reinforced concrete piles to form a continuous retaining structure. Primary piles are installed first, followed by reinforced secondary piles after sufficient curing. This technique provides excellent groundwater control and soil retention, making it ideal for deep excavations, basements, and foundation support in challenging ground conditions.

The Manual Auger Method is a reliable piling technique suitable for locations with restricted access or where low noise and vibration are essential. A tripod and manual winch system are used to drill boreholes using a helical auger. This method is commonly employed for pile diameters ranging from 250 mm to 1000 mm and offers an economical solution for smaller foundation projects.

Our Truck Mounted Rotary (TMR) rigs utilize continuous bentonite slurry circulation to stabilize boreholes during drilling. Auger drilling is performed to the required depth while bentonite slurry supports the excavation and carries excavated soil back to a recycling tank. This method ensures bore stability, efficient spoil removal, and high productivity, particularly in loose or soft soil strata.

The DMC Pile Method employs Mendola-type rigs combined with bentonite drilling fluid for safe and efficient pile construction. Surface soil is loosened using a bailer before drilling continues with a percussion chisel. Bentonite slurry stabilizes the bore while transporting excavated material to settling pits. Once the desired depth is achieved, the drilling tools are removed and the final depth is verified before reinforcement and concreting.

This method utilizes tractor-mounted rotary drilling rigs for fast and economical pile boring. Auger drilling is carried out to the required depth, with DMC rods added progressively to achieve deeper penetration through varying soil strata. It is particularly suitable for medium-depth foundation works and offers drilling capacities of up to 16 meters with excellent operational efficiency.
Our Work in Action
Click any image or video to view it in full screen.










Recent Projects
Pile FoundationConstruction Process







Survey, Setting Out & Guide Casing Installation
Detailed survey, marking of pile locations, and installation of temporary guide casing.
- Detailed survey and marking of pile locations
- Verification of pile coordinates and levels
- Positioning of Hydraulic Rotary Piling Rig
- Installation of temporary guide casing
- Ensures accurate pile alignment and protects bore opening

Pile Boring & Excavation
Drilling of pile bore using Hydraulic Rotary Rig to required depth.
- Drilling of pile bore using Hydraulic Rotary Rig
- Excavation carried out to the required depth and founding strata
- Suitable drilling tools used for soil, rock, or hard strata
- Continuous monitoring of depth, verticality, and pile diameter
- Removal and disposal of excavated soil from site

Slurry Support & Borehole Cleaning
Preparation and circulation of Bentonite/Polymer Slurry and borehole cleaning.
- Preparation and circulation of Bentonite/Polymer Slurry
- Stabilization of borehole walls during drilling
- Recycling of slurry through slurry plant
- Cleaning of borehole bottom to remove loose sediments
- Final inspection of bore depth and cleanliness

Reinforcement Cage Installation
Fabrication and lowering of reinforcement cage into the bore.
- Fabrication of reinforcement cage as per approved drawings
- Installation of spacers, couplers, lifting points, and cover blocks
- Lowering of reinforcement cage into the completed bore
- Accurate positioning and level adjustment
- Quality inspection before concrete placement

Tremie Concreting
Continuous concrete placement using tremie pipes.
- Installation of tremie pipes up to borehole bottom
- Continuous placement of concrete from bottom to top
- Prevention of concrete segregation through tremie method
- Displacement and recovery of slurry during concreting
- Completion of pile concreting in one uninterrupted operation

Pile Completion & Quality Control
Final pile completion, head trimming, and quality assurance.
- Extraction of temporary casing during or after concreting
- Recording of concrete consumption and pile parameters
- Pile head chipping up to cut-off level
- Verification of pile depth, diameter, and concrete quality
- Completion of testing, documentation, and quality assurance
- Ready for pile cap and foundation construction
Temporary Casing for Pile Foundation in India
Temporary casing is an important component of certain pile foundation construction methods, particularly in bored pile drilling operations where additional support is required to maintain borehole stability. It generally consists of a steel casing installed into the ground to support the upper or unstable portion of a drilled bore. Temporary casing helps control soil movement and reduces the possibility of bore collapse during drilling and reinforcement installation. Jalmala Boring Works brings third-generation foundation construction experience dating back to 1962.
During bored pile construction, ground conditions can vary considerably across different project locations. Loose soil, filled ground, soft deposits and groundwater-affected strata may create challenges during drilling. In such conditions, temporary steel casing can provide mechanical support to the borehole while excavation progresses. Its dimensions, installation depth and removal sequence depend on the geotechnical investigation and approved construction methodology.
Temporary casing installation generally involves positioning a steel casing at the designated pile location and advancing it into the ground using suitable construction equipment. Depending on the site conditions and drilling method, casing may be installed before or alongside the excavation process. The casing helps maintain the required bore diameter and provides support to surrounding soil during pile shaft formation.
Temporary casing is commonly considered in bored cast-in-situ pile construction, rotary bored piling and other deep foundation applications. The selection of casing depends on factors such as pile diameter, required drilling depth, soil composition, groundwater conditions and site accessibility. Proper casing installation is important for maintaining the designed pile geometry and reducing construction difficulties in unstable ground.
In groundwater-affected locations, temporary casing may help control the upper bore section, although additional groundwater management or bore-support measures may also be necessary. The construction team must evaluate the ground conditions and select an appropriate drilling and stabilization method. Casing alone may not be sufficient for every geological condition, so suitable engineering procedures are essential.
Once the required drilling depth is achieved, the bore is prepared for reinforcement installation and concrete placement according to the approved foundation design. Depending on the construction method, temporary casing may be withdrawn during or after concrete placement in a controlled sequence. The extraction process must be properly coordinated with concrete placement to maintain the integrity and continuity of the completed pile.
Jalmala Boring Works is a family-owned, third-generation foundation construction company specializing in pile foundations, diaphragm walls and ground anchors. With a company history dating back to 1962, it has experience in foundation construction involving challenging ground conditions, deep drilling requirements and complex infrastructure projects. Its specialization supports different commercial, industrial and infrastructure construction needs.
Proper execution of temporary casing operations involves monitoring casing alignment, installation depth, borehole conditions and drilling progress. Construction teams should also ensure that casing dimensions and installation procedures comply with the approved engineering specifications. Coordination between drilling, reinforcement placement and concreting operations is important for achieving the required foundation quality.
Temporary casing is particularly relevant to projects involving high-rise buildings, commercial developments, industrial facilities, bridges and infrastructure construction where bored pile foundations are specified. Depending on the project, it may be used alongside other foundation engineering methods to address difficult soil conditions and maintain construction stability.
When selecting a pile foundation contractor in India, it is important to consider experience in bored pile drilling, understanding of ground conditions, equipment capabilities and construction quality control. Temporary casing requirements should be evaluated according to the project specifications rather than applying the same installation method to every site.
If your construction project requires bored pile drilling, temporary casing applications or deep foundation construction, contact Jalmala Boring Works to discuss your project requirements. Providing the proposed pile diameter, drilling depth, site location and available geotechnical information can help determine a suitable construction approach.