Pile Foundation
Bored Cast-in-Situ Piling Specialists
Jalmala Boring Works provides Pile Foundation and Deep Foundation Solutions using Bored Cast-in-Situ Piles for residential, commercial, industrial, and infrastructure projects. With advanced Hydraulic Rotary Rigs, we construct piles from 300 mm to 1800 mm diameter and depths of up to 50 metres, delivering reliable load-bearing capacity across soft soil, hard rock, and high groundwater conditions.

Our Piling Methods
We deploy six proven techniques — selected based on soil profile, site constraints, and project requirements.

We specialize in bored piling with diameters ranging from 200 mm to 2000 mm and depths up to 50 meters. Using advanced hydraulic rotary rigs, we execute piling operations efficiently across a wide range of soil conditions. Our fleet includes high-performance rotary drilling rigs capable of working in restricted headroom areas while delivering precision, stability, and high productivity.

Secant pile walls are constructed by intersecting reinforced concrete piles to form a continuous retaining structure. Primary piles are installed first, followed by reinforced secondary piles after sufficient curing. This technique provides excellent groundwater control and soil retention, making it ideal for deep excavations, basements, and foundation support in challenging ground conditions.

The Manual Auger Method is a reliable piling technique suitable for locations with restricted access or where low noise and vibration are essential. A tripod and manual winch system are used to drill boreholes using a helical auger. This method is commonly employed for pile diameters ranging from 250 mm to 1000 mm and offers an economical solution for smaller foundation projects.

Our Truck Mounted Rotary (TMR) rigs utilize continuous bentonite slurry circulation to stabilize boreholes during drilling. Auger drilling is performed to the required depth while bentonite slurry supports the excavation and carries excavated soil back to a recycling tank. This method ensures bore stability, efficient spoil removal, and high productivity, particularly in loose or soft soil strata.

The DMC Pile Method employs Mendola-type rigs combined with bentonite drilling fluid for safe and efficient pile construction. Surface soil is loosened using a bailer before drilling continues with a percussion chisel. Bentonite slurry stabilizes the bore while transporting excavated material to settling pits. Once the desired depth is achieved, the drilling tools are removed and the final depth is verified before reinforcement and concreting.

This method utilizes tractor-mounted rotary drilling rigs for fast and economical pile boring. Auger drilling is carried out to the required depth, with DMC rods added progressively to achieve deeper penetration through varying soil strata. It is particularly suitable for medium-depth foundation works and offers drilling capacities of up to 16 meters with excellent operational efficiency.
Our Work in Action
Click any image or video to view it in full screen.










Recent Projects
Pile FoundationConstruction Process







Survey, Setting Out & Guide Casing Installation
Detailed survey, marking of pile locations, and installation of temporary guide casing.
- Detailed survey and marking of pile locations
- Verification of pile coordinates and levels
- Positioning of Hydraulic Rotary Piling Rig
- Installation of temporary guide casing
- Ensures accurate pile alignment and protects bore opening

Pile Boring & Excavation
Drilling of pile bore using Hydraulic Rotary Rig to required depth.
- Drilling of pile bore using Hydraulic Rotary Rig
- Excavation carried out to the required depth and founding strata
- Suitable drilling tools used for soil, rock, or hard strata
- Continuous monitoring of depth, verticality, and pile diameter
- Removal and disposal of excavated soil from site

Slurry Support & Borehole Cleaning
Preparation and circulation of Bentonite/Polymer Slurry and borehole cleaning.
- Preparation and circulation of Bentonite/Polymer Slurry
- Stabilization of borehole walls during drilling
- Recycling of slurry through slurry plant
- Cleaning of borehole bottom to remove loose sediments
- Final inspection of bore depth and cleanliness

Reinforcement Cage Installation
Fabrication and lowering of reinforcement cage into the bore.
- Fabrication of reinforcement cage as per approved drawings
- Installation of spacers, couplers, lifting points, and cover blocks
- Lowering of reinforcement cage into the completed bore
- Accurate positioning and level adjustment
- Quality inspection before concrete placement

Tremie Concreting
Continuous concrete placement using tremie pipes.
- Installation of tremie pipes up to borehole bottom
- Continuous placement of concrete from bottom to top
- Prevention of concrete segregation through tremie method
- Displacement and recovery of slurry during concreting
- Completion of pile concreting in one uninterrupted operation

Pile Completion & Quality Control
Final pile completion, head trimming, and quality assurance.
- Extraction of temporary casing during or after concreting
- Recording of concrete consumption and pile parameters
- Pile head chipping up to cut-off level
- Verification of pile depth, diameter, and concrete quality
- Completion of testing, documentation, and quality assurance
- Ready for pile cap and foundation construction
Tremie Concreting Contractor in India
Tremie concreting is an important concrete placement technique used in deep foundation construction, particularly for bored cast-in-situ pile foundations. It involves placing concrete through a specially designed tremie pipe that extends towards the bottom of the drilled borehole. This method allows concrete to be placed from the bottom upward while displacing groundwater or supporting slurry. Jalmala Boring Works brings third-generation foundation construction experience dating back to 1962.
In bored pile construction, drilling is carried out to the specified depth and diameter according to approved structural drawings and geotechnical investigation. Depending on ground conditions, the borehole may contain groundwater, bentonite slurry or polymer support fluid. Tremie concreting provides a controlled method of placing concrete within these conditions while helping prevent contamination and segregation when properly executed.
The tremie pipe is generally assembled using connected steel sections and positioned inside the prepared borehole. Before concrete placement begins, the system is prepared using an appropriate initial charging arrangement to prevent direct mixing between the fresh concrete and the fluid inside the bore. Concrete is then introduced through the pipe and discharged near the bottom of the pile.
During tremie concreting, fresh concrete rises gradually from the bottom of the borehole and displaces the surrounding groundwater or support slurry. The lower end of the tremie pipe must remain sufficiently embedded in the fresh concrete throughout placement, according to the approved method statement. Maintaining this embedment helps prevent unwanted contact between fresh concrete and the surrounding fluid.
Concrete quality is an important factor in successful tremie operations. The concrete mix should have suitable workability and flow characteristics to pass through the tremie pipe and fill the pile section effectively. Mix design, slump or flow requirements, setting characteristics and delivery arrangements must comply with the approved project specifications.
Continuous and properly coordinated concrete placement is essential during tremie operations. Interruptions can affect concrete flow and may create construction difficulties. The concrete supply, tremie pipe arrangement and placement sequence should therefore be planned before starting the operation. Concrete levels and the tremie embedment should be monitored throughout the process.
Tremie concreting is widely used in bored cast-in-situ piles, diaphragm wall construction and other underground foundation applications where concrete needs to be placed below water or support fluid. The technique is particularly relevant to high-rise buildings, bridges, industrial facilities, commercial developments and major infrastructure projects requiring deep foundations.
Before starting concrete placement, the borehole should be inspected and cleaned according to the approved construction procedure. Reinforcement cages must be installed at the specified location and depth. The tremie pipe arrangement, concrete supply and equipment should also be checked to ensure that the placement operation can proceed as planned.
Jalmala Boring Works is a family-owned, third-generation company specializing in pile foundations, diaphragm walls and ground anchors. With a company history dating back to 1962, the organization has experience in deep foundation construction, challenging ground conditions and complex infrastructure requirements. Its foundation construction specialization supports commercial, industrial and infrastructure developments.
Quality control during tremie concreting involves monitoring concrete delivery, placement continuity, concrete workability, tremie pipe embedment and the rising concrete level. Construction records should include relevant placement details and concrete quantities to support quality verification. All procedures should follow approved engineering specifications and applicable construction standards.
When selecting a pile foundation contractor in India, important considerations include experience in bored pile construction, understanding of tremie concreting procedures, equipment capabilities and site execution planning. Proper coordination between drilling, reinforcement installation and concrete placement is essential for achieving the specified foundation requirements.
If your construction project requires bored cast-in-situ piles, tremie concrete placement or deep foundation construction, contact Jalmala Boring Works to discuss your project requirements. Providing the proposed pile diameter, drilling depth, site location and geotechnical information can help establish a suitable construction approach.
