JBW
Jalmala Boring WorksSpecializing in Pile FoundationsPartnered with India's Leading Builders & ContractorsSpecializing in Diaphragm WallSpecializing in Ground AnchorsSince 1962500+ ProjectsSpecializing in Pile FoundationsSpecializing in Diaphragm WallSpecializing in Ground AnchorsJalmala Boring WorksSince 1962Partnered with India's Leading Builders & ContractorsJalmala Boring WorksSpecializing in Pile FoundationsPartnered with India's Leading Builders & ContractorsSpecializing in Diaphragm WallSpecializing in Ground AnchorsSince 1962500+ ProjectsSpecializing in Pile FoundationsSpecializing in Diaphragm WallSpecializing in Ground AnchorsJalmala Boring WorksSince 1962Partnered with India's Leading Builders & Contractors
Gmail
Metro Rail & Infrastructure Foundations

Metro Piling Contractor in India

Jalmala Boring Works undertakes metro-related piling and deep foundation activities for infrastructure developments. Our capabilities include bored cast-in-situ piles, secant piles, diaphragm walls and ground anchor systems for suitable elevated and underground construction projects.

Metro Infrastructure

Strong Foundations for Urban Connectivity

Deep foundation and underground retaining solutions for metro stations, elevated structures, depots and associated infrastructure.

1962Established
50mPublished pile depth capability
Metro Rail Foundation Engineering

Deep Foundation Solutions for Metro Rail Infrastructure Projects

Metro rail construction involves complex foundation and underground engineering requirements. Elevated metro corridors require foundations for piers and supporting structures, while underground stations and access structures may require deep excavation support systems.

Jalmala Boring Works provides piling and deep foundation services for infrastructure projects. Our capabilities include bored cast-in-situ piling, hydraulic rotary rig drilling, DMC percussion methods, secant pile construction, diaphragm walls and ground anchors.

Our published project profile records metro related work including Metro Project Phase 1, Metro Train Depot Workshop and Ahmedabad Metro Package C-1. Project methods and execution requirements vary according to the scope, approved drawings and site conditions.

Discuss your requirements with our metro piling contractor team in India for an initial project discussion.

Company Capabilities

Jalmala Boring Works

A third-generation deep foundation specialist based in Ahmedabad, Gujarat, undertaking piling, diaphragm wall and ground anchor work.

1962Company establishment
300–1800 mmPublished pile diameter range
Up to 50 mPublished pile depth capability
Pan IndiaProject coverage
Infrastructure Engineering

Foundation Requirements in Metro Rail Construction

Different metro structures require different foundation and excavation support systems based on structural loads, ground conditions and construction methodology.

01

Elevated Metro Viaducts

Pile foundations may support pier structures and transfer loads from elevated metro corridors into suitable ground strata.

02

Metro Station Structures

Station foundations and retaining systems are selected according to structural configuration, excavation depth and site conditions.

03

Underground Metro Stations

Diaphragm walls and other retaining systems can support deep excavations for underground station boxes and access structures.

04

Metro Train Depots

Depot buildings, workshops and associated structures may require piling based on ground investigation and foundation design.

05

Metro Entry and Exit Structures

Secant piles, soldier piles or other retaining arrangements may be considered for station entrances and underground access areas.

06

Utility and Service Structures

Deep foundations and excavation support systems may be required for selected service buildings, shafts and associated infrastructure.

Our Services

Metro Piling and Underground Construction Capabilities

We provide piling and retaining structure services for suitable infrastructure projects according to project drawings, specifications and site requirements.

01

Bored Cast-in-Situ Piling

Bored cast-in-situ piles are constructed by drilling a borehole, installing reinforcement and placing concrete. These piles can be used for elevated metro structures and other infrastructure foundations where specified by design.

02

Hydraulic Rotary Rig Piling

Hydraulic rotary rigs are used for controlled pile boring across suitable soil and rock profiles. Rig selection depends on pile dimensions, drilling depth, access and site conditions.

03

Secant Pile Walls

Secant pile walls consist of overlapping piles that create a retaining structure. They may be used for underground station excavations, entrances and other metro-related structures.

04

Diaphragm Wall Construction

Reinforced concrete diaphragm walls provide retaining support for deep excavations. They are used in suitable underground station and metro infrastructure applications.

05

Soldier Pile Construction

Soldier piles can form part of temporary or permanent excavation support arrangements, depending on the approved retaining wall design and site requirements.

06

Ground Anchor Installation

Temporary and permanent grouted ground anchors can provide lateral support to retaining walls during excavation and construction where permitted by design.

Metro Project Experience

Published Metro-Related Project Experience

Jalmala Boring Works' published company profile records the following metro-related assignments.

2017

Metro Project Phase 1

Afcons Infrastructure Ltd.

Published profile records 1000 mm / 750 mm diameter piling work, 20 piles and 349.20 metres of total work.

2018

Metro Train Depot Workshop

URC Construction Ltd.

Published profile records 800 mm diameter piling work, 36 piles and 567 metres of total work.

2021

Ahmedabad Metro Package C-1

Afcons Infrastructure Ltd.

Listed in the company's published project history as an Ahmedabad Metro project.

Project details above are based on the company's published project profile. They are historical project references and do not imply current involvement in those projects.

Technical Capabilities

Piling and Diaphragm Wall Specifications

Published company capabilities for evaluating suitable piling and retaining structure requirements.

300–1800 mm

Bored pile diameter range

Up to 50 m

Published pile depth capability

400–1000 mm

Published diaphragm wall thickness range

Up to 40 m

Published diaphragm wall trench depth

These figures describe published company capabilities. Final pile and wall dimensions, depths, reinforcement and load requirements are determined by approved engineering designs and actual site conditions.

Work Methodology

Our Metro Piling Execution Process

A coordinated approach helps manage piling and deep foundation activities in accordance with project specifications.

01

Project Study

Review metro project drawings, geotechnical investigation reports, pile schedules and technical specifications.

02

Site and Equipment Planning

Evaluate site access, working platform, equipment requirements, utility constraints and execution sequence.

03

Setting Out

Verify pile positions and construction reference points against approved drawings and site survey information.

04

Drilling and Excavation

Carry out pile boring or retaining wall excavation using the selected construction method and suitable support systems.

05

Reinforcement and Concreting

Install reinforcement cages and complete concrete placement in accordance with the approved construction procedure.

06

Quality Checks

Maintain construction records and coordinate specified inspections, testing and project quality documentation.

Why Jalmala Boring Works

An Experienced Deep Foundation Partner for Metro Infrastructure

Metro infrastructure requires coordinated foundation execution, appropriate equipment and careful attention to ground conditions. Jalmala Boring Works brings experience in piling and underground retaining structure activities for infrastructure developments.

✓

Deep foundation experience since 1962

✓

Published metro-related project experience

✓

Bored cast-in-situ piling capabilities

✓

Hydraulic rotary rigs and DMC drilling methods

✓

Secant pile and diaphragm wall capabilities

✓

Temporary and permanent ground anchor systems

✓

Project execution across India

Project Enquiry

Planning a Metro Infrastructure Project?

Contact our team to discuss metro piling, underground station foundations, diaphragm walls, secant piles and ground anchor requirements.

Send Project Enquiry
Frequently Asked Questions

Metro Piling Contractor India – FAQs

Common questions about metro rail piling, underground station foundations, diaphragm walls and deep foundation construction.

01.What is metro piling work?+

Metro piling work involves constructing deep foundation piles to support metro rail infrastructure such as elevated viaducts, station structures, depot buildings and other associated civil structures. The pile type, dimensions and installation method are determined by project drawings and geotechnical conditions.

02.Why are pile foundations used in metro rail projects?+

Pile foundations are used when structural loads, soil conditions, groundwater or settlement requirements make deep foundations suitable. They transfer loads from metro structures to deeper soil or rock strata as specified by the foundation design.

03.Which piling methods are used for metro projects?+

Depending on project requirements, metro piling may involve bored cast-in-situ piles, hydraulic rotary drilling, DMC percussion drilling, secant piles and soldier piles. The method is selected based on the approved design, ground profile, access and site constraints.

04.What is the difference between metro piling and diaphragm wall construction?+

Piles are generally used as deep foundation elements or as part of retaining systems. Diaphragm walls are reinforced concrete underground retaining walls commonly used for deep excavations, underground metro stations and other below-ground structures.

05.Are diaphragm walls suitable for underground metro stations?+

Diaphragm walls are commonly considered for underground metro station excavations because they can provide retaining support and help manage groundwater when designed and constructed with suitable joint and water-control systems.

06.What are secant piles in metro construction?+

Secant piles are overlapping bored piles constructed in sequence to form a retaining wall. They can be used to support excavations for metro entrances, station boxes, shafts and other underground structures, subject to the project design.

07.Does Jalmala Boring Works have metro project experience?+

Jalmala Boring Works' published project profile records metro-related work including Metro Project Phase 1, Metro Train Depot Workshop and Ahmedabad Metro Package C-1. Its project information also lists metro and underground station-related work.

08.What pile diameter and depth capabilities does Jalmala publish?+

Jalmala Boring Works publishes bored cast-in-situ pile capabilities from 300 mm to 1800 mm in diameter and depths up to 50 metres. Actual pile dimensions and depths depend on the project design, site investigation and equipment requirements.

09.Can ground anchors be used in metro excavation projects?+

Ground anchors can provide lateral support to retaining structures during deep excavation. Their use depends on the excavation design, soil and rock conditions, nearby properties, underground utilities and project-specific approvals.

10.How can I contact a metro piling contractor in India?+

You can contact Jalmala Boring Works at +91 93745 45415 or +91 98250 73418, or email jalmala.pile@gmail.com. Share the project location, foundation drawings, geotechnical report and scope of work for an initial discussion.

Jalmala Boring Works

Building Strong Foundations for Metro Infrastructure

Contact Jalmala Boring Works for metro piling, deep foundation and underground retaining structure project enquiries across India.

Our Service

Pile Foundation

Bored Cast-in-Situ Piling Specialists

Jalmala Boring Works provides Pile Foundation and Deep Foundation Solutions using Bored Cast-in-Situ Piles for residential, commercial, industrial, and infrastructure projects. With advanced Hydraulic Rotary Rigs, we construct piles from 300 mm to 1800 mm diameter and depths of up to 50 metres, delivering reliable load-bearing capacity across soft soil, hard rock, and high groundwater conditions.

Bored Cast-in-Situ Piles: 300 mm – 1800 mm Diameter
Pile Depths up to 50 Metres
Hydraulic Rotary Rigs & DMC Percussion Methods
Temporary & Permanent Steel Casing
Tremie Concreting (RMC & Site-Mix)
Static & Dynamic Pile Load Testing
Suitable for Soft Soil, Hard Rock & High
Groundwater Conditions
Complete Deep Foundation Solutions from Design
Support to Execution
Pile Foundation — Jalmala Boring Works
50mMax Depth
How We Work

Our Piling Methods

We deploy six proven techniques — selected based on soil profile, site constraints, and project requirements.

Hydraulic Rig
01
Hydraulic Rig

We specialize in bored piling with diameters ranging from 200 mm to 2000 mm and depths up to 50 meters. Using advanced hydraulic rotary rigs, we execute piling operations efficiently across a wide range of soil conditions. Our fleet includes high-performance rotary drilling rigs capable of working in restricted headroom areas while delivering precision, stability, and high productivity.

Secant Pile Walls
02
Secant Pile Walls

Secant pile walls are constructed by intersecting reinforced concrete piles to form a continuous retaining structure. Primary piles are installed first, followed by reinforced secondary piles after sufficient curing. This technique provides excellent groundwater control and soil retention, making it ideal for deep excavations, basements, and foundation support in challenging ground conditions.

Manual Auger Method
03
Manual Auger Method

The Manual Auger Method is a reliable piling technique suitable for locations with restricted access or where low noise and vibration are essential. A tripod and manual winch system are used to drill boreholes using a helical auger. This method is commonly employed for pile diameters ranging from 250 mm to 1000 mm and offers an economical solution for smaller foundation projects.

TMR — Water Circulation
04
TMR — Water Circulation

Our Truck Mounted Rotary (TMR) rigs utilize continuous bentonite slurry circulation to stabilize boreholes during drilling. Auger drilling is performed to the required depth while bentonite slurry supports the excavation and carries excavated soil back to a recycling tank. This method ensures bore stability, efficient spoil removal, and high productivity, particularly in loose or soft soil strata.

DMC Pile Method
05
DMC Pile Method

The DMC Pile Method employs Mendola-type rigs combined with bentonite drilling fluid for safe and efficient pile construction. Surface soil is loosened using a bailer before drilling continues with a percussion chisel. Bentonite slurry stabilizes the bore while transporting excavated material to settling pits. Once the desired depth is achieved, the drilling tools are removed and the final depth is verified before reinforcement and concreting.

Tractor Mounted Rotary Rig
06
Tractor Mounted Rotary Rig

This method utilizes tractor-mounted rotary drilling rigs for fast and economical pile boring. Auger drilling is carried out to the required depth, with DMC rods added progressively to achieve deeper penetration through varying soil strata. It is particularly suitable for medium-depth foundation works and offers drilling capacities of up to 16 meters with excellent operational efficiency.

Featured Work

Recent Projects

2025–26
AFCONS INFRASTRUCTURE LTD
Twin Tunnel Underground Station
Jaipur
2024
LARSEN & TOUBRO (L&T) CONSTRUCTION
Bullet Train Section — Vadodara C-6 Package
Vadodara
2025–26
PSP PROJECTS LTD
Adani ACMD Plot A and D
Mundra, Gujarat
Jalmala Boring Works

Pile FoundationConstruction Process

Step 01 – Survey, Setting Out & Guide Casing InstallationStep 02 – Pile Boring & ExcavationStep 03 – Slurry Support & Borehole CleaningStep 04 – Reinforcement Cage InstallationStep 05 – Tremie ConcretingStep 06 – Pile Completion & Quality Control
01/06
Step 01 – Survey, Setting Out & Guide Casing Installation
01

Survey, Setting Out & Guide Casing Installation

Detailed survey, marking of pile locations, and installation of temporary guide casing.

  • Detailed survey and marking of pile locations
  • Verification of pile coordinates and levels
  • Positioning of Hydraulic Rotary Piling Rig
  • Installation of temporary guide casing
  • Ensures accurate pile alignment and protects bore opening
Phase 1
Step 02 – Pile Boring & Excavation
02

Pile Boring & Excavation

Drilling of pile bore using Hydraulic Rotary Rig to required depth.

  • Drilling of pile bore using Hydraulic Rotary Rig
  • Excavation carried out to the required depth and founding strata
  • Suitable drilling tools used for soil, rock, or hard strata
  • Continuous monitoring of depth, verticality, and pile diameter
  • Removal and disposal of excavated soil from site
Phase 2
Step 03 – Slurry Support & Borehole Cleaning
03

Slurry Support & Borehole Cleaning

Preparation and circulation of Bentonite/Polymer Slurry and borehole cleaning.

  • Preparation and circulation of Bentonite/Polymer Slurry
  • Stabilization of borehole walls during drilling
  • Recycling of slurry through slurry plant
  • Cleaning of borehole bottom to remove loose sediments
  • Final inspection of bore depth and cleanliness
Phase 3
Step 04 – Reinforcement Cage Installation
04

Reinforcement Cage Installation

Fabrication and lowering of reinforcement cage into the bore.

  • Fabrication of reinforcement cage as per approved drawings
  • Installation of spacers, couplers, lifting points, and cover blocks
  • Lowering of reinforcement cage into the completed bore
  • Accurate positioning and level adjustment
  • Quality inspection before concrete placement
Phase 4
Step 05 – Tremie Concreting
05

Tremie Concreting

Continuous concrete placement using tremie pipes.

  • Installation of tremie pipes up to borehole bottom
  • Continuous placement of concrete from bottom to top
  • Prevention of concrete segregation through tremie method
  • Displacement and recovery of slurry during concreting
  • Completion of pile concreting in one uninterrupted operation
Phase 5
Step 06 – Pile Completion & Quality Control
06

Pile Completion & Quality Control

Final pile completion, head trimming, and quality assurance.

  • Extraction of temporary casing during or after concreting
  • Recording of concrete consumption and pile parameters
  • Pile head chipping up to cut-off level
  • Verification of pile depth, diameter, and concrete quality
  • Completion of testing, documentation, and quality assurance
  • Ready for pile cap and foundation construction
Phase 6